How Long Industry Registration Takes in Nepal

  1. Standard Duration for Registration Process

The standard duration for industry registration in Nepal ranges from 7 to 21 working days, depending on the industry type and submission of required documents. The Department of Industry (DOI) begins by verifying documents, followed by inspection (if necessary), and final approval. Delays commonly occur due to documentation errors. MedhaCorpLaw provides document review services to reduce the risk of such delays.

  1. Timeline According to Industry Type

Registration timelines vary depending on the classification of the industry:

  • Micro and Cottage Industries: 5 to 10 working days
  • Small and Medium Industries: 10 to 15 working days
  • Large-Scale Industries: 15 to 21 working days

Industries requiring foreign investment or environmental clearance may take additional time. MedhaCorpLaw advises clients on applicable timelines during industry-type assessment.

  1. Time Estimates for Pre-Application Stage

The pre-application stage typically spans 5 to 10 working days. Activities include feasibility studies, choosing an appropriate legal structure, and collecting relevant documents. MedhaCorpLaw offers consultation for efficient business structuring and document planning.

  1. Document Preparation Timeframe

Document preparation generally requires 7 to 14 days, depending on access to professional services and the need for notarization or translation. Essential documents include:

  • Identity proof
  • Company registration certificate or citizenship
  • PAN certificate
  • Lease or land ownership documents
  • Feasibility report
  • Environmental clearance (if required)

MedhaCorpLaw prepares these documents in compliance with current laws to avoid rejection or queries.

  1. Processing Time by Authorities

The Department of Industry processes applications in 5 to 10 working days after receiving complete submissions. The process includes internal document checks, industry classification, and field inspections. MedhaCorpLaw coordinates with authorities on behalf of clients for faster processing.

  1. Delays Due to Document Errors

Document-related issues may delay the process by 5 to 7 working days. Common reasons include:

  • Incomplete or outdated forms
  • Missing notarization
  • Errors in project reports
  • Lack of translation of foreign language documents

To mitigate this, MedhaCorpLaw conducts pre-submission audits for accuracy and completeness.

  1. Timeframe for Online vs Manual Filing

Online filing shortens registration time compared to manual submission:

  • Online Filing: 5 to 7 working days
  • Manual Filing: 10 to 15 working days

Digital filing ensures faster verification and real-time communication. MedhaCorpLaw guides clients through the Department of Industry’s online portal for efficient submission.

  1. Legal Time Limit for Final Approval

Under the Industrial Enterprises Act, 2076 (2019), the DOI must issue registration certificates within 15 working days from the date of complete application submission. This legal provision sets a clear timeframe. MedhaCorpLaw monitors and enforces this timeline on behalf of clients.

  1. Fast-Track Options and Services

Certain industries may benefit from fast-track registration through:

  • Business Facilitation Centers
  • One-Stop Service Centers at DOI

Registration can be completed within 3 to 5 working days if eligibility criteria are met. MedhaCorpLaw helps clients access fast-track services by pre-qualifying their applications.

  1. Timeline After Industry Approval

After receiving approval, post-registration tasks take 5 to 10 working days, including:

  • Issuance of the industry certificate
  • PAN and VAT registration
  • Local level registration
  • License applications

MedhaCorpLaw assists with all post-approval compliance to ensure uninterrupted operations.

  1. Real-World Cases of Registration Duration

Examples based on actual cases:

  • Local Garment Factory: Registered in 7 days via online platform
  • Hydropower Company: Took 30 days due to environmental clearance
  • Foreign-Invested IT Firm: Registered in 21 days after inter-ministerial coordination

MedhaCorpLaw managed each case by providing legal and administrative support to streamline timelines.

  1. Time for Post-Registration Compliance

Post-registration compliance can take 7 to 14 working days, which includes:

  • Tax registration
  • Labor office compliance
  • Municipality registration
  • Social security enrollment

MedhaCorpLaw provides end-to-end services for all post-registration compliance requirements.

  1. Follow-Up and Communication Tips

Follow-ups should be made every 2–3 days. Effective steps include:

  • Using tracking IDs in online portals
  • Promptly responding to queries
  • Direct communication with DOI officials
  • Maintaining a communication record

MedhaCorpLaw follows up with departments regularly on behalf of its clients.

  1. Checklist for Faster Approval

Applicants are advised to ensure:

  • PAN registration is completed
  • Notarized and translated documents are attached
  • Business and feasibility plans are accurate
  • Online submission is used
  • All attachments are uploaded correctly

MedhaCorpLaw uses this checklist internally to ensure submissions meet all legal requirements.

  1. Legal Help to Speed Up Process

Legal assistance minimizes risk of delay. MedhaCorpLaw supports clients by:

  • Drafting and reviewing documents
  • Preparing business and feasibility reports
  • Communicating with officials
  • Handling legal queries from DOI

Their legal team ensures that applications comply with relevant laws and are processed within standard timeframes.

 

FAQs

 

  1. How long does it usually take?
    It takes 7 to 21 working days, based on industry type and completeness of submitted documents.
  2. Can I register within a week?
    Yes, registration can be completed in 5 to 7 days using fast-track or online services.
  3. Does the industry type matter?
    Yes. Large or high-risk industries require more scrutiny, resulting in longer processing times.
  4. Why do delays happen often?
    Delays usually result from missing or incorrect documents and lack of inter-agency coordination.
  5. Can I track the application?
    Yes. Online platforms offer real-time status updates using assigned tracking numbers.
  6. What’s the fastest option?
    Using one-stop centers or working with MedhaCorpLaw offers the fastest legal support.
  7. Is online filing faster?
    Yes, online systems accelerate document submission and reduce response times.
  8. Do I get status updates?
    Yes. Applicants can receive automated updates and direct responses from the Department of Industry.
  9. Can a lawyer speed it up?
    Yes. Legal advisors at MedhaCorpLaw ensure accurate and complete submissions for quicker approvals.
  10. What if there’s a time overrun?
    You may contact DOI directly or ask your legal representative to submit a follow-up request.

 

Cart (0 items)