Establishing a 100 to 200 bed hospital in Nepal involves compliance with federal, provincial, and local laws. The legal foundation comes primarily from the Public Health Service Act 2075, Health Institution Operation and Standards Guidelines, Local Government Operation Act 2074, Environmental Protection Act 2076, and Industrial Enterprise Act 2076. Hospitals of this size fall under large-scale service institutions, requiring extensive infrastructure, multiple specialized departments, highly qualified staff, and strict environmental compliance. Approval involves municipal, provincial, and federal authorities. Each stage demands accurate documentation, structural compliance, environmental studies, and proof of operational readiness. This multi-tiered regulatory framework ensures patient safety, service quality, infection control, and adherence to national healthcare standards. 100 to 200 Bed Hospital Registration in Nepal.

1. Legal Framework for 100 to 200 Bed Hospital Registration

The Public Health Service Act 2075 requires all hospitals to secure a license before operation. The Health Institution Operation and Standards Guidelines specify requirements for land, building layout, sanitation, staff, and clinical infrastructure. The Local Government Operation Act 2074 empowers municipalities to issue site suitability and building approval. The Environmental Protection Act 2076 mandates an Environmental Impact Assessment (EIA) for hospitals exceeding 50 beds, making it compulsory for this bed range. The Industrial Enterprise Act 2076 governs hospitals operating as commercial entities. Together, these laws establish a layered legal system to ensure quality, safety, and compliance across operational, structural, and environmental dimensions. Medha Law and Partners Is a leading law firm in Nepal.

2. Land and Building Requirements

For a 100 to 200 bed hospital, land and building requirements are extensive. The National Building Code and municipal regulations require earthquake-resistant construction, fire exits, ventilation, accessibility, and segregation of clinical and non-clinical zones. Essential infrastructure includes emergency rooms, operating theatres, ICUs, HDUs, maternity wards, radiology and laboratory units, pharmacy, administration, staff housing, and waste management areas. Municipal engineers must issue structural safety certification. Hospitals must also provide backup water, electricity, and medical gas systems. Compliance with these infrastructure standards ensures operational safety, infection control, and patient accessibility.

3. Environmental Compliance

Hospitals in this bed range must conduct a full Environmental Impact Assessment (EIA) as per Environmental Protection Act 2076 and its regulation 2077. The EIA examines effluent management, biomedical waste, noise, air quality, radiation hazards, water use, and potential community impact. It must propose mitigation measures and long-term monitoring plans. The provincial Ministry of Environment approves the EIA before the Ministry of Health can issue the operation license. Hospitals must implement biomedical waste segregation, autoclaving, incineration, and wastewater treatment as approved in the EIA.

4. Corporate Registration

Hospitals may register as Private Limited Companies, Public Limited Companies, Non-Profit Organizations, or Cooperatives, depending on their investment model. Most commercial hospitals adopt the Private Limited Company model under the Company Act 2063. Registration requires a memorandum of association, articles of association, capital structure, shareholder list, and board resolution. Foreign investors must obtain approval under the Foreign Investment and Technology Transfer Act 2075. Corporate registration must be completed before applying for municipal, provincial, or Ministry approvals. Hospitals must also secure PAN and VAT registration.

5. Local Government Approvals

Municipal authorities review land suitability, building permit compliance, location recommendation, waste management readiness, and fire safety. They check road access, sanitation, and utility connections under the Local Government Operation Act 2074. For hospitals in urban areas, municipalities assess traffic flow and surrounding land use. Only after local approval will provincial and federal authorities process licensing. Local approvals include confirmation of infrastructure compliance, environmental coordination, and utility access letters.

6. Provincial Health Directorate Review

The Provincial Health Directorate reviews the hospital’s staffing, departmental capacity, equipment, emergency readiness, infection prevention measures, and quality assurance systems. Site inspections verify compliance with Health Institution Operation Guidelines. All departments, including ICU, surgery, maternity, radiology, laboratory, pharmacy, and emergency units, must meet staffing and technical standards. The Directorate issues a recommendation letter necessary for Ministry of Health licensing.

7. Ministry of Health Licensing

The Ministry of Health and Population grants the final hospital operation license. Submission must include corporate documents, municipal approval, provincial recommendation, EIA clearance, staff lists, equipment lists, building completion certificates, and infection control plans. A Ministry expert committee conducts on-site verification for structural integrity, patient safety, service readiness, emergency capacity, and biomedical waste management. Once verified, the Ministry issues the Hospital Operation License, valid for a defined period and renewable under compliance conditions.

Documents Required

Corporate Documents

  • Company registration certificate

  • Memorandum and Articles of Association

  • Board resolution

  • PAN certificate

  • Shareholder list

Land and Building Documents

  • Land ownership/lease certificate

  • Cadastral map and land tax receipt

  • Building permit and completion certificate

  • Structural safety certificate

  • Fire safety approval

Environmental Documents

  • EIA report and approval letter

  • Waste management plan

  • Radiation safety plan

Hospital Operation Documents

  • Staffing plan

  • Equipment inventory

  • Service department layout

  • Infection prevention plan

  • Quality assurance plan

  • Emergency readiness plan

  • Biomedical waste treatment plan

Local Government Documents

  • Location recommendation letter

  • Sanitation and utility approval letters

Step-by-Step Registration Process

  1. Acquire land and finalize building design

  2. Obtain municipal building permit

  3. Construct hospital per approved design

  4. Conduct full EIA and obtain provincial approval

  5. Complete corporate registration and PAN/VAT registration

  6. Prepare staffing and equipment plans

  7. Submit municipal approvals including location recommendation

  8. Apply to Provincial Health Directorate for technical review

  9. Undergo provincial inspection and secure recommendation

  10. Submit full application to Ministry of Health

  11. Ministry inspection and verification

  12. Receive Hospital Operation License and begin operation

Renewal and Compliance

Licenses must be renewed periodically under the Public Health Service Act 2075. Renewal requires updated staff lists, annual operational statistics, quality assurance reports, biomedical waste management, and environmental monitoring reports. Radiology, pharmacy, and emergency services also require separate renewal with the relevant authorities. Failure to maintain standards can result in suspension or cancellation of the license.

Common Challenges

Delays often occur due to incomplete EIA reports, inadequate structural design, insufficient staffing, or missing municipal approvals. Hospitals may also face delays in equipment verification or compliance with infection control standards. Detailed planning, coordination between corporate, engineering, and medical teams, and pre-inspection verification significantly reduce delays and regulatory risks.

FAQs

1. Is an EIA required for 100 to 200 bed hospitals?
Yes. The Environmental Protection Act 2076 requires a full EIA for hospitals above 50 beds, including waste, effluent, radiation, and community impact assessments. Approval must be obtained before Ministry licensing.

2. How long does registration take?
Typically 8–12 months, depending on building completion, EIA approval, staffing readiness, and document accuracy. Delays commonly occur in municipal and provincial inspections.

3. Can foreign investors establish a hospital of this size?
Yes. Under the Foreign Investment and Technology Transfer Act 2075, foreign investors must secure Department of Industry approval and comply with corporate and licensing requirements.

4. Who issues the final hospital operation license?
The Ministry of Health and Population issues the license after reviewing all documents, conducting inspection, and verifying compliance with the Public Health Service Act 2075. Provincial and municipal approvals are mandatory prerequisites.